CCE provided civil engineering services for this 44 unit condominium project in Oxnard. Our work included grading design, utility design, and hydrology / stormwater treatment design. Challenges on this project included the lack of underground storm drain to connect to, as well as extremely shallow sewer connections which created challenges with onsite sewer as well as generating required clearance between sewer and water lines. We were able to solve these issues by creating a site underground 3-D model of all utilities to identify potential clashes prior to construction.